Design-Build Consulting
The cheapest changes are the ones made on paper. This is the stage where that is still possible.

Typical range
$4,500 – $18,000
Typical duration
3 – 8 weeks
Starts with
A scoping call and site visit
What is included
Site feasibility
Outline cost modelling
Permit strategy
Programme planning
Value engineering
Architect coordination
Most renovation budgets are lost in the first three weeks, before anyone has picked up a tool. Decisions get deferred, drawings get approved without a cost attached, and by the time the numbers arrive the design is too far along to change cheaply.
What is included
Site feasibility, outline cost modelling, permit strategy, programme planning, value engineering, and coordination with your architect or designer if you already have one.
What you get at the end
A written feasibility report, an outline budget with ranges rather than false precision, and a realistic programme including approval time. If we are not the right builder for the job, that report will say so.
Recent work

Kitchen Renovation
Ridgeline Kitchen
Ridgeline Avenue
·
2025
·
9 weeks
A galley kitchen opened into the dining room, finished in oak and honed marble.

Bathroom Remodeling
Marble Primary Bath
Elm Court
·
2025
·
6 weeks
A windowless bathroom rebuilt around a skylight and a single slab of stone.

Full Home Renovation
Bayfield Residence
Bayfield
·
2024
·
5 months
A 1960s house taken back to studs and rebuilt for how the family lives now.