02

Bathroom Remodeling

Most bathroom failures are not about tile. They are about what was done, or skipped, behind it.

Bathroom Remodeling

Typical range

$28,000 – $90,000

Typical duration

4 – 7 weeks

Starts with

A moisture and substrate inspection

What is included

Strip-out and disposal

Waterproofing and substrate

First and second fix plumbing

Underfloor heating

Tiling and stonework

Ventilation and lighting

Bathrooms are the smallest rooms we build and the most unforgiving. Everything happens in a confined space, in a wet environment, above rooms you care about. The finishes are the last ten per cent of the job and the first thing anyone judges.

What is included

Strip-out and disposal, full waterproofing and substrate preparation, first and second fix plumbing, underfloor heating, tiling and stonework, vanity and joinery, ventilation, lighting and final commissioning.

How we price it

Fixed price after survey. We open up and inspect the substrate before quoting rather than pricing an assumption, because that is where the expensive surprises live.

Ready to talk about your project?

Send us the shape of it and we will come back with an honest range and a realistic schedule.

© 2026 Anvil Template. All rights reserved.

Create a free website with Framer, the website builder loved by startups, designers and agencies.