02
Bathroom Remodeling
Most bathroom failures are not about tile. They are about what was done, or skipped, behind it.

Typical range
$28,000 – $90,000
Typical duration
4 – 7 weeks
Starts with
A moisture and substrate inspection
What is included
Strip-out and disposal
Waterproofing and substrate
First and second fix plumbing
Underfloor heating
Tiling and stonework
Ventilation and lighting
Bathrooms are the smallest rooms we build and the most unforgiving. Everything happens in a confined space, in a wet environment, above rooms you care about. The finishes are the last ten per cent of the job and the first thing anyone judges.
What is included
Strip-out and disposal, full waterproofing and substrate preparation, first and second fix plumbing, underfloor heating, tiling and stonework, vanity and joinery, ventilation, lighting and final commissioning.
How we price it
Fixed price after survey. We open up and inspect the substrate before quoting rather than pricing an assumption, because that is where the expensive surprises live.
Recent work

Kitchen Renovation
Ridgeline Kitchen
Ridgeline Avenue
·
2025
·
9 weeks
A galley kitchen opened into the dining room, finished in oak and honed marble.

Bathroom Remodeling
Marble Primary Bath
Elm Court
·
2025
·
6 weeks
A windowless bathroom rebuilt around a skylight and a single slab of stone.

Full Home Renovation
Bayfield Residence
Bayfield
·
2024
·
5 months
A 1960s house taken back to studs and rebuilt for how the family lives now.
© 2026 Anvil Template. All rights reserved.
